SuperTerminal 1 is the world's most advanced and the largest single air cargo terminal with a total floor area of over 328,000 square metres. The average cargo handling capacity is 2.6 million tonnes per year.

Associated Engineers Ltd joined hands with Siemens Dematic in design, supply and installation of air cargo handling system. The highly automated cargo handling system provides fast turn-round times and maximum efficiency in the cargo handling process. It consists of computer-controlled stacker crane, transfer vehicle, bulk storage and container storage stacker crane, roller conveyor, lifting workstation, container storage and bulk storage racking.