MCL Example - Consultant

HKIE Competence RequirementsRelevant Mechanical Engineering Consultant Experiences
Applying Mechanical Engineering Knowledge (C1, C2, C11)
C1.Comprehend and apply knowledge of accepted principles underpinning widely applied good practice for professional engineering;
  • Apply professional knowledge and skills in mechanical engineering, such as fluid dynamics principles to determine the pressure requirement for a hydraulic system, thermodynamics principles to determine the heating or cooling system, affinity laws for fans/pumps, mechanical principles related to vibration or acoustic control, material selection related to different mechanical properties requirement, etc. to design, implement, operate and maintain systems or conduct incident investigations;
  • Provide professional advice on mechanical engineering for cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc.
C2.Comprehend and apply knowledge of accepted principles underpinning good practice for professional engineering that is specific to Hong Kong; and
  • Understand and familiar with statutory requirements from local authorities (e.g. ASD, BD, DSD, EMSD, EPD, FSD, LD, WSD, etc.), with regard to ordinances, regulations or code of practice, etc.;
  • Apply professional knowledge and skills in mechanical engineering, in accordance with statutory requirements, to the design, implementation, operation and maintenance, investigation of incidents or provision of professional advice on mechanical engineering for cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc. in accordance with statutory requirements.
C11.Maintain the currency of his or her professional engineering knowledge and skills.
  • Organize and attend related CPD activities in accordance with HKIE CPD requirements.
Developing Technical Solution (C3 and C4)
C3.Define, investigate and analyze complex engineering problems in accordance with good practice for professional engineering; and
  • Identify a complex engineering problem, the constraints (e.g., space constraint), and the technical requirements (e.g., design criteria and/or design parameters) for a mechanical engineering system;
  • During the analysis, consider the design, manufacture, construction, installation, operation, maintenance, or repair of the mechanical engineering system;
  • Investigate infrequently encountered complex engineering problems without precedent reference of solutions; and be responsible to resolve the problems with originality in the analysis.
C4.Design or develop solutions to complex engineering problems in accordance with good practice for professional engineering.
  • Design or develop solutions for cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc. to meet the defined requirements and objectives.
Managing Engineering Work (C5, C6, C7 and C12)
C5.Be responsible for making decisions on part or all of one or more complex engineering activities;
  • Be responsible for the management of new installation and/or maintenance of cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc.;
  • Manage the use of diverse resources including people, money, equipment, materials and technologies;
  • Participate the resolution of critical problems arising from interactions among wide-ranging technical, engineering and other issues;
  • Prepare tender document and conduct tender assessment for a project with the consideration of fee, technical aspect, programme, manpower, etc.
C6.Manage part or all of one or more complex engineering activities in accordance with good engineering management practice;
  • Supervise the design and/or construction work of cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc. and Inspect the quality of the work; and deal with any problems that arise.
C7.Identify, assess and manage engineering risk; and
  • Conduct risk assessment and manage the risks associated with the design, installation, repair, maintenance and overhaul of the cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc.
C12.Exercise sound professional engineering judgement.
  • Be responsible for engineering activities requiring judgement in technical, quality, manpower, financial, safety, environment aspects.
Upkeeping Professional Acumen (C8, C9 and C10)
C8.Conduct engineering activities to an ethical standard prescribed by the HKIE;
  • Understand and familiarize with HKIE ethical standard and show how to apply them in projects.
C9.Recognize the reasonably foreseeable social, cultural, health, safety, sustainability and environmental effects of professional engineering activities generally; and
  • Involve themselves in the application of energy-saving systems, the development of schemes with reference to climate change, activities related to health and safety regulations, etc.
C10.Communicate clearly with other engineers and others that he or she is likely to deal with in the course of his or her professional engineering activities.
  • Demonstrate the effective communication skills with workers, engineers, stakeholders and public related to design, implementation, operation and maintenance, incidents investigation and providing professional advice on mechanical engineering for cooling system, heating system, ventilation system, piping system, air compressor system, mounting system, hoisting system, lift and escalator, control and monitoring system, etc.
Exemplar on Training and Experience Report
 
Background

i. Periods of Training and Experience

ii. Chronological order, giving inclusive dates in months and years

iii. As details of duties can be found in application form, they may not be repeated in this report.

m

To

Company

Position

1/2015

12/2016

The Engineering Consultant Company

Graduate Trainee

 

 

Projects/Duties

 

 

 

Assist the Engineer to prepare the mechanical system design for [n] nos. of engineering projects.

 

Sub Total :(Months/Years)

2 years

 

Professional Experience

From

To

Company

Position

1/2017

12/2017

The Engineering Consultant Company

Assistant Engineer

1/2018

12/2020

The Engineering Consultant Company

Engineer

 

 

Projects/Duties

 

 

 

Prepare the engineering design for mechanical engineering [system name] system for [project name] with total area [area] m2 in [location] serving [n] population.
(Consultant Fee: HKD [cost]M or Construction Cost: HKD [cost]M)

 

 

 

Liaised with client, contractors, government officials, etc. and managed the construction programme and the budget plan for [project name], managed the project team with [n] members.
(Consultant Fee: HKD [cost]M or Construction Cost: HKD [cost]M)

 

Sub Total (Months/Years)

4 years

 

Total
(Months/Years)

6 years

 

Professional Experiences

i. state the Applicant’s precise positions have occupied in each case and describe clearly the degree of the Applicant’s responsibility assigned; use the first person (I, me, my) to show Applicant’s personal contribution;

ii. indicate the size and cost of the works; keep in about 3 – 4 projects or works demonstrating all competences;

iii. elaborate on any particular problems encountered and how the Applicant arrived at viable solutions with consideration of options or alternatives;

iv. provide evidence to demonstrate the competences (At most four relevant competences should be quoted at a time)

v. provide evidence or examples of recent work to support their claim of attaining professional status, such as reports, plans, calculations, photographs, etc. as appropriate

Applying Mechanical Engineering KnowledgeCompetence

Project Title: Construction of [name] underground street in [location]

Position and Project Brief: Engineer in charge of Mechanical Ventilation System Design for the [/] m-long underground street serving [n] population.

(Consultant Fee: HKD [cost]M or Construction Cost: HKD [cost]M)

Professional Experiences

I was the Engineer in charge of the Mechanical Ventilation System Design for the [/] m-long underground street in [location] serving [n] population. This Mechanical Ventilation System was designed to provide air ventilation and smoke extraction for the Underground Street. This Mechanical Engineering Ventilation design was complex as the underground street was developed in several phases. Additional consideration was given to the life-time performance and the interfacing issues during the interim stages.

I firstly prepared the design for smoke extraction and proposed a layout with [n] fans distributed in [n] ductworks to meet the requirement in the Fire Engineering Report. I determined the fan capacity and the minimum smoke extraction rate for this system to ensure that each smoke zone could extract smoke at [/] m3/s with a make-up air velocity lower than [/] m/s. This design also could meet the requirement stipulated in Building Department Fire Safety Code, the smoke extraction requirement in the Fire Services Department Code of Practice for Minimum Fire Service Installations, the air quality requirement in associated with Environmental Impact Assessment (EIA) Report, etc. Then, I applied the Darcy Weisbach equation to determine the pressure loss due to friction along the ductwork and tunnel. I also determined the pressure loss through various fittings and equipment of the Mechanical Ventilation System. This Mechanical Ventilation System design was accepted by the client.

C1, C2

Maintain Engineering Knowledge

I joined and attended seminars, factory visits, group discussions organized by the HKIE, the Institution of Mechanical Engineers (IMechE), etc. to upkeep my technical knowledge, project management skills, etc. Through direct discussion with experts in different fields, I obtained the up-to-date technical knowledge of building services engineering industry.

Moreover, I obtained in-depth knowledge of the structure and working principles, design code, etc. through my professional experiences on projects. I also developed my knowledge of material science related to design of the Heating, Ventilation, and Air Conditioning (HVAC) and drainage system etc.

C11
Developing Technical SolutionsCompetence

Project Title: Construction of [system name] in [location]

Position: Engineer in charge to prepare the HVAC system design

Project Brief: Drainage system for [project name] project with total area [area]m² in [location] serving [n] population.

(Consultant Fee: HKD [cost]M or Construction Cost: HKD [cost]M)

Professional Experiences

I was the Engineer in charge of the drainage system design for the [project name] with a total area of [area]m² in [location] serving [n] population.

The drainage system design was complex as the project involved a large roof surface area (i.e. [area] m²) which made it difficult to fulfill the statutory requirement stipulated in Cap123i Building Regulation and client’s expectations. To resolve this engineering problem, I applied the Manning Equation to determine the pipework dimension for a conventional gravity system with a 3 m/s flow velocity, which would be [length]mm. The [length]mm drainage pipes were too large and not acceptable by the client.

Hence, I recommended using a siphonic rainwater system to balance the diverse needs. I prepared the pipework layout of this siphonic rainwater system and then carried out the hydraulic calculation by applying the Darcy Weisbach equation. I found out that using siphonic rainwater system could reduce the pipe size and fall gradient with [n] times better performance. My proposal to use a siphonic rainwater system was accepted by the client and approved by the Building Department.

C3, C4
Managing Engineering WorkCompetence

Project Title: Upgrading of HVAC system for [name] Building

Position and Project Brief: Project engineer to manage and supervise the construction activities associated with the upgrading of HVAC system for [name] Building

(Consultant Fee: HKD [cost]M or Construction Cost: HKD [cost]M)

Professional Experiences

When I seconded to a mechanical sub-contractor company, I was the project engineer responsible for managing the upgrading of HVAC system for [name] Building. I managed the budget plan, project programme, manpower arrangement, etc. I adopted “MS Project” to identify the critical paths of different construction activities, e.g. submission date, ordering, delivery, Testing and Commissioning (T&C), etc. For the budget plan, I carefully reviewed the quotations of different mechanical equipment and chose the mechanical equipment with acceptable quality and a competitive price. Besides, when I planned for the manpower arrangement, I estimated the required man-hours of the key tasks with the aid of records of previous completed projects to ensure that my manpower arrangement was feasible and the works could be completed in a timely manner.

In the detailed design stage, I conducted risk assessments and managed the risk associated with the implementation of upgrading the HVAC system with careful consideration of opportunities and consequences of potential incidents according to designed piping systems, possible installation sequence, and method of equipment and pipework.

C5, C6
C12